首页> 美国政府科技报告 >U.S. St. Lawrence Seaway Asset Renewal Program Capital Investment Plan, FY 2012-2016
【24h】

U.S. St. Lawrence Seaway Asset Renewal Program Capital Investment Plan, FY 2012-2016

机译:美国圣劳伦斯海道资产更新计划资本投资计划,2012-2016财年

获取原文

摘要

Starting in 2009, the SLSDC initiated its 10-year U.S. Seaway Asset Renewal Program (ARP) for its navigation infrastructure and facilities. The 52 ARP projects and equipment included in the ARP Capital Investment Plan (CIP) address various needs for the two U.S. Seaway locks, the Seaway International Bridge connecting Ontario and New York, maintenance dredging, operational systems, and Corporation facilities and equipment. None of these investments will result in increases to the authorized depth or width of the navigation channel or to the size of the two existing U.S. locks. The ARP marks the first time in the Seaways history that a coordinated effort to repair and modernize the U.S. Seaway infrastructure has taken place. For the FY 2012-2016 time frame, the Seaway ARP/CIP includes 39 projects and equipment estimated at $100.2 million with total funding for each year of the plan constrained to funding targets for those years as estimated and approved by the Office of Management and Budget (OMB). Dollar amounts for ARP projects are project feasibility estimates and can vary by an industry-recognized 20-30 percent. Currently, the overall ARP remains on schedule to be completed within the original 10-year timeframe. Project estimates and schedules may fluctuate at various points in the lifespan of the ARP and will be revised as needed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号