首页> 外文期刊>Railway Track and Structures >THE SUCCESS OF THE BENJAMIN FRANKLIN BRIDGE REHAB PROJECT
【24h】

THE SUCCESS OF THE BENJAMIN FRANKLIN BRIDGE REHAB PROJECT

机译:本杰明·弗兰克林桥修复项目的成功

获取原文
获取原文并翻译 | 示例
           

摘要

The Benjamin Franklin Bridge, a suspension bridge across the Delaware River connecting Philadelphia, Pa., and Camden, N.J., carries 100,000 vehicles and 35,000 rail commuters per day on its seven lanes, two railroad tracks and two walkways for pedestrians and bicyclists. So, when Port Authority Transit Corporation (PATCO) and the Delaware River Port Authority (DRPA) had to implement two long-term continuous track outages for the first time in history, totaling 110 days for major track rehabilitation and reconstruction, strategic planning and cooperation were a top priority.
机译:本杰明·富兰克林桥是横跨特拉华河连接宾夕法尼亚州费城和新泽西州卡姆登市的吊桥,每天在其7条车道,两条铁轨和两条供行人和骑自行车的人行道上载运100,000辆汽车和35,000名通勤者。因此,当港务局过境公司(PATCO)和特拉华河港务局(DRPA)有史以来第一次实施两次长期连续轨道停运时,总共需要110天进行主要轨道的修复和重建,战略规划与合作是当务之急。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号