首页> 外文期刊>Rail Business Intelligence >No sign of Desiro orders
【24h】

No sign of Desiro orders

机译:没有Desiro订单的迹象

获取原文
获取原文并翻译 | 示例
           

摘要

Approval of the order of Siemens Desiro EMUs for London Midland and TransPennine Express is expected to slip to September after DfT missed its previous target of May 2011. This would see the delivery of either 15 or 18 four-ear sets to provide additional capacity at London Midland, and enable TPE Manchester - Scotland services to switch to electric operation with the December 2013 timetable change. The exact total depends on a DfT decision on the proposed Barnt Green - Bromsgrove electrification scheme, which would increase the London Midland requirement by three trainsets. This small number has led Siemens to insist that it will only build one type of trainset, and a Class 380 derivative as proposed for TPE would not be compatible with London Midland's Class 350 fleet.
机译:在DfT未能实现之前设定的2011年5月目标之后,预计伦敦Desiro EMU的伦敦Midland和TransPennine Express订单的批准将推迟至9月。这将看到交付15或18套四耳式耳机以在伦敦提供更多的容量。 Midland,并随着2013年12月时间表的变更,使TPE曼彻斯特-苏格兰服务转换为电力运营。确切的总数取决于DfT对拟议的Barnt Green-Bromsgrove电气化计划的决定,这将使伦敦米德兰的需求增加三列火车。如此少的数量导致西门子坚持只建造一种类型的火车,而为TPE提议的380级衍生品将与伦敦米德兰的350级机队不兼容。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第393期|p.6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号