...
首页> 外文期刊>Rail Business Intelligence >Hammond confirms HS2 route
【24h】

Hammond confirms HS2 route

机译:哈蒙德确认HS2路线

获取原文
获取原文并翻译 | 示例
           

摘要

In an oral statement given to the House of Commons on December 20, Transport Secretary Philip Hammond confirmed that - with a few adjustments to mitigate local impacts - the alignmet selected by HS2 Ltd for a new high-speed line between London and the West Midlands (RB1362 p8) had been adopted by the government. At the strategic level, he announced two important additions to the project. The first is a branch to Heathrow Airport, expected to leave HS2 where crosses over the M25 in the Colne Valley and run on the surface alongside the motorway to the airport.
机译:运输部长菲利普·哈蒙德(Philip Hammond)在12月20日给下议院的口头声明中确认,通过一些调整以减轻本地影响,HS2 Ltd选择了在伦敦和西米德兰兹之间新建的高速铁路线( RB1362 p8)已被政府采用。在战略层面,他宣布了该项目的两个重要补充。第一个是希思罗机场的分支,预计将离开HS2,在科恩谷穿越M25并沿着通往机场的高速公路在地面上运行。

著录项

  • 来源
    《Rail Business Intelligence》 |2011年第381期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号