...
首页> 外文期刊>PV news >Che un Fiasco! The Italian FIT Situation
【24h】

Che un Fiasco! The Italian FIT Situation

机译:真惨!意大利散客情况

获取原文
获取原文并翻译 | 示例
           

摘要

Aside from the fact that the Gestore dei Servizi Energetici (GSE) is not quite sure how much solar was installed in Italy in 2010, if the number is in fact 6 GW as claimed (4 GW of which is supposedly awaiting grid interconnection), the Italian government will ultimately have to pay for 6 GW worth of FITs at the 2010 rate, one of the more generous that is available in Europe. There were more than 50,000 applications, and if the government pays the 2010 incentives for the entire 4 GW in applications pending grid connection, that would mean an approximately $60 billion incentive burden. According to Vishal Shah of Barclays Capital, this figure is "higher than the German or Spanish subsidy burdens."
机译:除了Gestore dei Servizi Energetici(GSE)不太确定2010年在意大利安装了多少太阳能外,如果该数量实际上是声称的6 GW(据称其中有4 GW正在等待电网互连),意大利政府最终将不得不按2010年的价格支付6 GW的FIT,这是欧洲最慷慨的之一。有超过50,000个应用程序,如果政府在未连接电网的情况下为全部4 GW的应用程序支付2010年的奖励,那将意味着大约600亿美元的奖励负担。巴克莱资本(Barclays Capital)的Vishal Shah认为,这一数字“高于德国或西班牙的补贴负担”。

著录项

  • 来源
    《PV news》 |2011年第3期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号