...
首页> 外文期刊>Proceedings of the IEEE >Emerging issues in power system planning
【24h】

Emerging issues in power system planning

机译:电力系统规划中的新问题

获取原文
获取原文并翻译 | 示例
           

摘要

Uncertainties in load growth, fuel prices, and regulation are all factors leading to complexity in power-system planning. The criteria and constraints that are important in system planning are reliability, environmental standards, economics, financial ability, and societal impacts. Some of the criteria conflict with the others, requiring some tradeoffs in making planning decisions. To plan a system considering these criteria, detailed analytical studies that typically simulate the operation of the system under the projected future conditions are performed. Attributes such as reliability levels and price of electricity estimated form these studies for different plans are compared to choose the robust plan. Least-cost or integrated resource planning, nonutility generation, and capacity purchases are specifically addressed to illustrate the technical and institutional issues involved in the electric utility planning process.
机译:负荷增长,燃油价格和监管方面的不确定性都是导致电力系统规划复杂的因素。在系统规划中重要的标准和约束是可靠性,环境标准,经济性,财务能力和社会影响。一些标准与其他标准冲突,因此需要在制定计划决策时进行权衡。为了考虑这些标准来计划系统,需要进行详细的分析研究,这些研究通常模拟系统在预期的未来条件下的运行。比较这些研究针对不同计划的可靠性级别和电价等属性,以选择可靠的计划。专门讨论了最低成本或集成的资源规划,非公用事业发电和容量购买,以说明电力公用事业规划过程中涉及的技术和体制问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号