首页> 外文期刊>Platts Megawatt Daily >Agencies start EIS review for Northwest hydro
【24h】

Agencies start EIS review for Northwest hydro

机译:代理商开始对西北水电进行EIS审查

获取原文
获取原文并翻译 | 示例
           

摘要

In a move that could affect hydroelectric operations in the Northwest,rnfederal agencies are beginning to prepare an environmental impactrnstatement on running 14 federal dams in the Columbia River basin.rnThe dams in Idaho, Montana, Oregon and Washington total aboutrn19,920 MW and produce about 66.8 million MWh a year. The US ArmyrnCorps of Engineers operates 12 of the dams and the Bureau ofrnReclamation operates two. The Bonneville Power Administrationrnmarkets the power.
机译:为了可能影响西北地区的水力发电,联邦机构开始准备在哥伦比亚河流域运行14座联邦水坝的环境影响声明。爱达荷州,蒙大拿州,俄勒冈州和华盛顿州的水坝总计约19,920兆瓦,发电量约每年6680万兆瓦时。美国陆军工程兵团经营12个大坝,而垦殖局则经营两个。邦纳维尔电力管理局(Bonneville Power Administration)销售电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号