首页> 外文期刊>Pipeline & gas journal >Turn-key Approach to Managing IMP Data
【24h】

Turn-key Approach to Managing IMP Data

机译:交钥匙管理IMP数据的方法

获取原文
获取原文并翻译 | 示例
           

摘要

Recent pipeline industry trends show a shift in focus from capturing Integrity Management Program (IMP) data, such as inline inspection results, CP programs, and identifying HCA locations, to how to effectively manage the data that has been collected. As part of prudent pipeline system management, operators are turning their attention to how IMP data is scrutinized and evaluated as it relates to the integrity decision making process. This, along with reviewing historical records and verifying their accuracy, is creating a data mining challenge that is proving to be difficult for many pipeline owners/operators.
机译:管道行业的最新趋势表明,重点已从捕获完整性管理程序(IMP)数据(例如在线检查结果,CP程序和识别HCA位置)转向如何有效地管理已收集的数据。作为审慎的管道系统管理的一部分,运营商将注意力转向与IMP数据相关的完整性决定过程中,如何检查和评估IMP数据。连同回顾历史记录并验证其准确性,这给数据挖掘带来了挑战,事实证明,这对许多管道所有者/运营商而言都是困难的。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第7期|p.129-130|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号