首页> 外文期刊>Nuclear waste news >Entergy Chooses SAFSTOR for Decommissioning of Vermont Yankee
【24h】

Entergy Chooses SAFSTOR for Decommissioning of Vermont Yankee

机译:Entergy选择SAFSTOR进行佛蒙特州洋基的退役

获取原文
获取原文并翻译 | 示例
           

摘要

Entergy Vermont Yankee announced that as a result of its site assessment study for the decommissioning of the nuclear power plant in Vernon, it has selected the SAFSTOR remediation option authorized by the Nuclear Regulatory Commission. According to NRC regulations, Entergy could take up to 60 years to clean up the site, which has been home to the nuclear power plant since 1972. It is also home to a spent fuel storage facility, at which is stored the nuclear waste produced in its 42 years of operation. The site assessment study also revealed cost for cleaning up the site is more than expected, at $1.24 billion.
机译:Entergy Vermont Yankee宣布,由于其对Vernon核电厂退役的现场评估研究的结果,它选择了核监管委员会授权的SAFSTOR补救方案。根据NRC的规定,Entergy可能需要长达60年的时间来清理该场地,该场地自1972年以来一直是核电站的所在地。它也是乏燃料存储设施的所在地,该设施用于存储核电厂产生的核废料。已有42年的历史。现场评估研究还显示,清理现场的成本超过了预期,为12.4亿美元。

著录项

  • 来源
    《Nuclear waste news》 |2014年第18期|5-6|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号