首页> 外文期刊>Nuclear Engineering and Design >Structural integrity assessment of pressure tubes for Wolsong Unit 1 based on operational experiences
【24h】

Structural integrity assessment of pressure tubes for Wolsong Unit 1 based on operational experiences

机译:基于运行经验的卧松1号机组压力管结构完整性评估

获取原文
获取原文并翻译 | 示例
           

摘要

Pressure tube integrity has been considered as a key issue since the first operation of the CANDU reactor. Wolsong Unit 1 has been in service since 1983 and subjected to inspections three times covering 44 tubes. The in-service Inspections revealed that a major portion of inspected tubes was in contact with calandria tubes. This is likely to Increase the probability of blister formation which is a potential threat to pressure tube integrity. Fortunately, the Inspection results indicated that no tube has been affected by blister formation so far.
机译:自CANDU反应器首次运行以来,压力管的完整性一直被视为关键问题。伍尔松1号机组自1983年以来一直服役,对44根试管进行了3次检查。在役检查显示,被检查管的大部分与排管接触。这可能会增加起泡的可能性,这是对压力管完整性的潜在威胁。幸运的是,检查结果表明,到目前为止,没有任何管子受到水泡形成的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号