首页> 外文会议>International conference on structural mechanics in reactor technology;SMiRT-15 >Structural Integrity Assessment of Pressure Tubes for Wolsung Unit 1 Based on Operational Experiences
【24h】

Structural Integrity Assessment of Pressure Tubes for Wolsung Unit 1 Based on Operational Experiences

机译:基于运行经验的卧松1号机组压力管结构完整性评估

获取原文

摘要

Pressure tube integrity has been considered as a key issue since the first operation of the CANDU reactor. Wolsung unit 1 has been in service since 1983 and subjected to inspections three times covering 44 tubes. The in-service inspections revealed that a major portion of inspected tubes was in contact with Clandria tubes. This is likely to increase the probability of blister formation which is a potential threat to pressure tube integrity. Fortunately, the inspection results indicated that no tube has been affected by blister formation so far. Nevertheless, to reduce the undue risk of blister formation the utility has decided to conduct spacer relocation every year until the entire core is covered. On the other hand, LBB analysis of pressure tubes using AGS performance measured at Wolsung unit 2 indicated that the operational safety margin was marginal when using 15-year operational data. This raises the concern of pressure tube integrity at Wolsung unit 1 which has had a more than 15-year operation. This paper presents the overall integrity evaluation of Wolsung unit 1 pressure tubes considering AGS performance test results and operating experience data.
机译:自CANDU反应器首次运行以来,压力管的完整性一直被视为关键问题。 Wolsung装置1自1983年开始投入使用,并进行了3次检查,涉及44条管子。使用中的检查表明,被检查管的大部分与Clandria管接触。这可能会增加起泡的可能性,这是对压力管完整性的潜在威胁。幸运的是,检查结果表明,到目前为止,还没有任何管子受到水泡形成的影响。然而,为了减少不必要的水泡形成风险,公用事业公司决定每年进行垫片重定位,直到覆盖整个芯子为止。另一方面,使用在Wolsung装置2上测得的AGS性能对压力管进行的LBB分析表明,当使用15年的运行数据时,运行安全裕度很小。这引起了已经运行超过15年的Wolsung装置1的压力管完整性问题。本文介绍了考虑到AGS性能测试结果和操作经验数据的Wolsung 1号压力管的整体完整性评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号