...
【24h】

New build

机译:新建

获取原文
获取原文并翻译 | 示例
           

摘要

The recent series of site preparation works at Hinkley Point C are nearing completion. These include earthworks, drainage works and culvert construction, concrete production facilities and welfare facilities along with roadworks to the site. EDF Energy have said that the next phase of onsite work, and associated developments, will require a substantial increase in spending levels, and will begin as soon as the final investment decision has been made. Horizon has recently appointed David Stearns as the business development director, to lead the development of Horizon's business strategy and co-ordinate delivery of the plans to ensure successful progression of the Wylfa Newydd and Oldbury projects. Horizon has said that Stearns will be responsible for negotiating key commercial agreements, including contracts for difference, funded decommissioning programmes and the financing arrangements, including HM Treasury-backed infrastructure UK guarantees.
机译:Hinkley Point C最近进行的一系列现场准备工作已接近完成。这些包括土方工程,排水工程和涵洞建设,混凝土生产设施和福利设施以及通往现场的道路工程。 EDF Energy表示,下一阶段的现场工作及相关开发将需要大幅增加支出水平,并将在做出最终投资决定后立即开始。 Horizo​​n最近任命David Stearns为业务发展总监,领导Horizo​​n业务战略的开发并协调计划的交付,以确保Wylfa Newydd和Oldbury项目的成功进行。 Horizo​​n曾表示,Stearns将负责谈判关键的商业协议,包括差价合约,有资金的退役计划以及包括英国财政部支持的基础设施担保在内的融资安排。

著录项

  • 来源
    《Nuclear future》 |2015年第4期|10-11|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号