首页> 外文期刊>Nuclear future >International news
【24h】

International news

机译:国际新闻

获取原文
获取原文并翻译 | 示例
           

摘要

An updated schedule for the ITER fusion project has been approved by the ITER Council, which represents the countries taking part in the project. Under the new schedule, first plasma is now slated for 2025 and the start of deuterium-tritium operation is set for 2035. A two-day meeting of the Council at the ITER headquarters at Saint-Paul-lez-Durance in France unanimously approved the project's baseline - its overall schedule and cost. The project is to build the world's biggest tokamak fusion reactor at Cadarache in southern France. It should be large enough and hot enough to reach 'ignition' and maintain a stable heat-generating plasma for minutes.
机译:国际热核聚变实验堆项目的更新时间表已得到国际热核聚变实验堆理事会的批准,该理事会代表了参与该项目的国家。根据新的时间表,现在将在2025年确定第一批等离子体,并将在2035年开始氘-operation操作。理事会在法国圣保罗-勒兹-杜兰斯国际热核实验堆总部举行的为期两天的会议一致通过了项目的基线-总体进度和成本。该项目将在法国南部的卡达拉奇建造世界上最大的托卡马克聚变反应堆。它应该足够大和足够热,以达到“点火”并在几分钟内保持稳定的发热等离子体。

著录项

  • 来源
    《Nuclear future》 |2017年第1期|10-11|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号