首页> 外文期刊>Naval Engineers Journal >Acquisition of the Enhanced maritime Prepositioning Force, MPF(E), Ship
【24h】

Acquisition of the Enhanced maritime Prepositioning Force, MPF(E), Ship

机译:采购增强型海上预置力量MPF(E),船舶

获取原文
获取原文并翻译 | 示例
       

摘要

The paper will describe the streamlined acquisition process involved in the procurement, an conver- wion, of the first two of three Enhanced Maritime Prepositioning Force (MPF(E)) Ships. This program was one of the first Programs undertaken within the Govern- Ment's new policy of Acquisition Reform, Which resulted in the development of "performance based' requirements for these ships. This program is notable in that one Prime contractor is responsible for the Accomplishment of all phases, and that The contractors participating were not Shipyards as is usually the fashion for Government ship acquisition programs.
机译:本文将描述三艘增强型海上预置部队(MPF(E))舰船中的前两艘的采购过程,即采购过程中的简化采购过程。该计划是政府在购置改革新政策中实施的首批计划之一,从而导致对这些船舶制定了“基于性能”的要求。该计划的显着之处在于,由一个总承包商负责所有阶段,而且参与的承包商不是造船厂,这通常不是政府购船计划的方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号