首页> 外文期刊>Modern Railways >GBRf receives first Ecofrets
【24h】

GBRf receives first Ecofrets

机译:GBRF收到第一eCofrets

获取原文
获取原文并翻译 | 示例
           

摘要

GB RAILFREIGHT(GBRf) has received the first Ecofret2 triple-container intermodal wagon sets in an order for 84 triple-wagon sets placed with leasing company VTG Rail.The wagons are being built by W. H. Davis at Shirebrook in the East Midlands. The new wagons are designed to carry the 20ft and 40ft boxes common in international maritime trade.The new design has additional container mounting points on the outer platforms, meaning either two 20ft or one 40ft box can be carried on all Ecofret2platforms, giving maximum loading flexibility. Designing the platforms around these box lengths gives the potential to avoid the empty spaces often seen on older wagons designed for 60ft boxes.
机译:GB Railfreight(GBRF)已收到第一个ECOFRET2三箱式多电容器,以便为84个Triple-Wagon集合装有租赁公司VTG Rail的14个Triple-Wagon套装。货车正在东米德兰兹的Shirebrook的W. H. Davis建造。 新货车旨在携带国际海事贸易中共同的20英尺和40英尺箱。新设计在外部平台上有额外的集装箱安装点,含有两个20英尺或一个40英尺箱,可以在所有ECOFRET2PLATFORM上携带,从而提供最大的负载灵活性 。 设计这些盒子长度周围的平台使得避免通常在专为60英尺盒设计的旧货车上看到的空的空间。

著录项

  • 来源
    《Modern Railways》 |2021年第6期|22-22|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号