...
首页> 外文期刊>Journal of Management in Engineering >Application of Lean Construction Concepts to Manage the Submittal Process in AEC Projects
【24h】

Application of Lean Construction Concepts to Manage the Submittal Process in AEC Projects

机译:精益建设概念在AEC项目中的提交过程管理中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Office processes are repetitive, common to multiple projects, involve multiple specialists, and are necessary to support the work of trades. Not much attention has been given to the management of office-related processes in the architecture, engineering, and construction (AEC) literature despite their importance in supporting core activities in this industry. Anecdotal evidence provided by industry practitioners and research carried out by the authors suggest that these processes lack transparency (e.g., actual durations are unknown, indicators are not used to manage the process) and suffer from low reliability, that is, planned times do not reflect the reality and are often underestimated. Aiming to address this gap in the literature, this paper presents a two-phase study carried out to investigate the submittal process in a construction company using lean construction concepts and tools. The study revealed that durations used to manage the submittal process are unreliable and often do not match what is indicated in schedules and contractual requirements. Actual lead times to process a submittal are variable and root causes for their variability are not properly understood; consequently, unreliable durations continue to be used to prepare schedules. The authors suggest that by using the method and variables presented in this paper for the submittal process, companies can take the first step in mapping this and other administrative processes in order to visualize the chain of tasks necessary to process information in their offices. This method provided transparency to the process managed and allowed the management team to identify areas that needed improvement in the process.
机译:办公流程是重复性的,对于多个项目来说是通用的,涉及多个专家,并且对于支持交易工作是必不可少的。尽管在支持该行业的核心活动中很重要,但对建筑,工程和建设(AEC)文献中与办公室相关的过程的管理并未给予太多关注。行业从业人员提供的轶事证据和作者进行的研究表明,这些过程缺乏透明度(例如,实际持续时间未知,指标未用于管理过程)并且可靠性低,也就是说,计划时间不能反映出现实,常常被低估。为了解决文献中的这一空白,本文提出了一个分为两个阶段的研究,以研究使用精益施工概念和工具的建筑公司的提交过程。该研究表明,用于管理提交流程的持续时间是不可靠的,并且通常与时间表和合同要求中指出的时间不匹配。处理提交的实际提前期是可变的,并且其可变性的根本原因未得到适当理解;因此,不可靠的持续时间继续被用于编制时间表。作者建议,通过使用本文介绍的方法和变量进行提交过程,公司可以采取第一步来绘制此过程和其他管理过程,以可视化在办公室处理信息所需的任务链。这种方法为所管理的流程提供了透明性,并使管理团队可以确定需要改进的领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号