Lessons Learned from Managing the Design Process of a Large and Complex Construction Project Seen in a Lean Construction Perspective

机译:从精益施工角度管理的大型和复杂建筑项目的设计过程中汲取了经验教训

获取原文

摘要

The construction project being studied is a government investment related to a relocation of a biomedical institute delivering research-based knowledge and contingency support in the fields of animal health, fish health and food safety. The project covers a total of 63,000 m~2 distributed over 10 buildings. The buildings have a very high degree of complexity due to a large proportion of special areas, great ambitions to the minimize environmental impact in addition to strict compliance to Infection Prevention and Control in order to achieve a world class product in its field. The project is procured as a design-bid-build project divided into 40 different execution contracts. The design alone has required 1 million hours and more than 100,000,000 Euro. The purpose of this article is to study the applied methodology for managing the detailed design to identify lessons learned from the project. The theory underlying the study is inspired by lean design management and design theory linked to design as phenomena, including reciprocal interdependencies, iteration, decomposition, design as a "wicked problem", learning, gradual maturation, etc. The article is based on an abductive research design and has been implemented as a case study where both qualitative and quantitative methods have been used. First, the study describes how the design process was managed. Furthermore, challenges that are revealed through interviews and a survey are presented. Uncovered are a widespread volume of negative iterations and waste, where reasons for the challenges are linked, among others, to the use of traditional management methodology, a long user process and late owner and user decisions. Finally, the key lessons learned from the case are further explored in how they could be solved by alternative management methodology.
机译:正在研究的建设项目是政府投资,该投资与搬迁生物医学研究所搬迁,为动物健康,鱼类健康和食品安全领域提供基于研究的知识和应急支持。该项目总共占地63,000毫米分布在10栋建筑物上。由于大量特殊区域,由于严格遵守感染防治,在最大限度地减少环境影响,建筑物具有很大程度的复杂性。该项目被采购为设计出价的项目分为40个不同的执行合约。单独设计需要100万小时,超过100,000,000欧元。本文的目的是研究用于管理详细设计的应用方法,以确定从项目中吸取的经验教训。该研究的理论受到瘦松设计管理和设计理论的启发,这些理论与设计相关的现象,包括互相相互依赖,迭代,分解,设计作为“邪恶问题”,学习,逐渐成熟等。本文基于绑架研究设计并已实施,作为一种案例研究,其中已经使用了定性和定量方法。首先,研究描述了设计过程的管理方式。此外,通过访谈和调查显示的挑战是展示的。未覆盖的是普遍存在的负面迭代和浪费,其中挑战的原因是涉及传统管理方法,长用户流程和后期所有者和用户决策。最后,通过替代管理方法如何解决,进一步探索了从案件中汲取的关键经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号