MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER

机译:极端天气下施工项目调度的多目标优化模型

获取原文
获取原文并翻译 | 示例
           

摘要

Extreme weather significantly impacts construction schedules and costs and can be a source of schedule delays and budget overruns. A multi-objective optimization model, presented herein for the scheduling of construction projects under extreme weather conditions, can generate optimalear optimal schedules that minimize the time and cost of construction projects in extreme weather regions. The model computations are organized as follows: (1) a scheduling module for developing practical schedules for construction projects, (2) a cost module for computing total project cost, and (3) a multi-objective module for determining optimalear optimal trade-offs between project time and cost. Two practical examples of the effects of extreme weather on construction time and direct cost are provided, the first of which shows the impact of extreme weather on construction time and cost, and the second of which demonstrates the ability of the model to generate and visually present the optimal trade-offs between the duration and costs of construction projects under extreme weather conditions.
机译:极端天气会严重影响施工进度和成本,并且可能是进度延迟和预算超支的原因。本文中提出的用于在极端天气条件下对建筑项目进行调度的多目标优化模型可以生成最优/接近最优的调度表,以使在极端天气区域中的建设项目的时间和成本最小化。模型计算的组织如下:(1)用于制定建设项目实际进度表的调度模块,(2)用于计算项目总成本的成本模块,以及(3)用于确定最佳/接近最佳交易的多目标模块-项目时间和成本之间的差异。提供了两个关于极端天气对施工时间和直接成本的影响的实际示例,其中第一个显示了极端天气对施工时间和成本的影响,第二个演示了模型生成和直观呈现的能力在极端天气条件下,建设项目的工期与成本之间的最佳平衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号