Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication

机译:协作模型:通过项目学习和有效的沟通,利用可重复使用的项目经验来管理设计变更

获取原文
获取原文并翻译 | 示例
           

摘要

This paper empirically studies the importance of managing design changes in dealing with time delay and cost overruns in construction projects. The main objective of this paper is to identify the causes of design changes and the implications on the Malaysian construction projects measured in terms of cost and time. It also aims to determine how rework induced from the design changes is detrimental to project performance and to suggest recommendations on how to overcome the related problem with project learning and effective communication in building construction. To investigate the factors giving rise to design changes, a total of 43 causes were first identified through a comprehensive literature review. The factors are categorised into client, consultant, contractor, site and external-related themes. This is followed by a qualitative research study involving semi structured interviews with 12 experienced industry practitioners comprising of clients, consultants, and contractors. Critical incident technique employing content analysis is used to analyse the interviews transcripts in detail to provide a rich picture of the causes of design changes, the implications for project delivery performance, enablers of effective communication, enablers of project learning and types of reusable project knowledge. The research findings were further integrated to develop a collaborative model to manage design changes using effective communication and project learning approach. This model highlights the importance of effective communication and project learning towards improving the level of competency and cohesiveness of project team in managing future projects. Capturing and sharing of reusable project experiences is essential towards maximising the benefits of past experiences (lessons learned), shortening the learning curve and adding value to future projects in design change management. (C) 2017 Elsevier Ltd. APM and IPMA. All rights reserved.
机译:本文从经验上研究了管理设计变更在处理建设项目中的时间延迟和成本超支方面的重要性。本文的主要目的是确定设计变更的原因以及对马来西亚建设项目的影响,包括成本和时间。它还旨在确定由设计变更引起的返工对项目绩效的不​​利影响,并就如何克服项目学习和建筑施工中的有效沟通的相关问题提出建议。为了调查引起设计变更的因素,首先通过全面的文献综述总共确定了43个原因。这些因素分为客户,顾问,承包商,现场和与外部相关的主题。接下来是定性研究,涉及对来自客户,顾问和承包商的12名经验丰富的行业从业者的半结构化访谈。使用内容分析的关键事件技术可详细分析采访记录,以提供有关设计变更原因,对项目交付绩效的影响,有效沟通的推动力,项目学习的推动力和可重用项目知识类型的丰富图片。研究结果被进一步整合以开发一种协作模型,以使用有效的沟通和项目学习方法来管理设计变更。该模型强调了有效的沟通和项目学习对于提高项目团队在管理未来项目中的能力和凝聚力的重要性。捕获和共享可重用的项目经验对于最大化过去经验(经验教训)的收益,缩短学习曲线并为设计变更管理中的未来项目增加价值至关重要。 (C)2017爱思唯尔有限公司APM和IPMA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号