首页> 外文期刊>International Journal of Production Research >Minimising utility work and utility worker transfers for a mixed-model assembly line
【24h】

Minimising utility work and utility worker transfers for a mixed-model assembly line

机译:减少混合模型装配线的公用事业工作和公用事业工人的转移

获取原文
获取原文并翻译 | 示例
       

摘要

Mixed-model assembly lines (MM Als) are types of production lines that are able to respond to diversified costumers' demand for a variety of models without holding large inventories. The effective utilisation of a mixed-model assembly line requires the determination of the assembly sequence for different models. In this paper, two objectives are considered in a sequential manner, namely minimising: (ⅰ) total utility work, which means work from an additional worker to assist an operator for completion of an assembly task; and (ⅱ) utility worker transfer which states the move of a utility worker to a different segment of the assembly line. First, due to the NP-hard nature of the problem, three heuristic methods are proposed with the aim of minimising total utility work. Then, the solutions which are obtained from the heuristics are improved in terms of the total number of utility worker transfers via a local search based method. Furthermore, the solution approach was applied in a real life mixed model tractor assembly line. Results validated the effectiveness of sequencing approach in terms of solution quality.
机译:混合模型装配线(MM Als)是生产线的类型,能够在不保持大量库存的情况下满足多样化的客户对各种模型的需求。混合模型装配线的有效利用需要确定不同模型的装配顺序。在本文中,以顺序的方式考虑了两个目标,即最小化:(ⅰ)总的公用事业工作,这意味着要由一名额外的工人来协助操作员完成组装任务的工作; (ⅱ)公用工转移,说明公用工移至装配线的其他部分。首先,由于问题的NP难性,提出了三种启发式方法,目的是使总的公用工作量最小。然后,通过基于本地搜索的方法,从启发式方法获得的解决方案在公用事业工作者转移总数方面得到了改善。此外,该解决方案方法已应用于现实生活中的混合模型拖拉机装配线。结果验证了测序方法在溶液质量方面的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号