THE NEW LEGAL FRAMEWORK FOR PV PLANTS WITH 'UNCERTIFIED' MODULES

机译:具有“未授权”模块的光伏电站新法律框架

获取原文
获取原文并翻译 | 示例
           

摘要

Recently enacted legislation (Law Decree 50/2017, converted into Law No.96 of 21 June 2017) has amended the so-called Romani Decree (Legislative Decree No.28/2011) by providing that PV plants with a nominal power higher than 3KW and having panels uncertified or with a non-compliant certification, on application of the owner, may avoid revocation of the feed-in-tariff (FiT) and be subject to a 20% reduction (from the entry into force of the FiT agreement). As clarified by the guidelines issued by GSE on 9 August 2017, the relevant application may be submitted by owners of PV plants that, following an inspection by GSE, have been found in breach of the rules applicable to modules certification and that, for this reason, have suffered revocation of the FiT.
机译:最近颁布的立法(第50/2017号法令,转换为2017年6月21日第96号法)对所谓的罗曼尼法(第28/2011号法令)进行了修正,规定光伏电站的标称功率应高于3KW且在拥有者的申请下使面板未经认证或具有不符合要求的认证,可以避免撤销上网电价(FiT),并应减少20%(自FiT协议生效以来) 。正如GSE在2017年8月9日发布的指南所阐明的那样,相关光伏电站的所有者可能提交了相关申请,而这些光伏电站在经过GSE的检查后被发现违反了适用于模块认证的规则,因此,已取消FiT。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号