...
首页> 外文期刊>Inside FERC >Tellurian to prepare Driftwood LNG site for full construction, build new pipeline
【24h】

Tellurian to prepare Driftwood LNG site for full construction, build new pipeline

机译:Tellurian准备漂流木LNG网站以全面建设,建立新的管道

获取原文
获取原文并翻译 | 示例
           

摘要

Tellurian will soon sign a long-term lease with the port authority whereits proposed Driftwood LNG facility is to be built in Louisiana so it canbegin preparing the site for full construction, Executive ChairmanCharif Souki said June 22.The developer, following two commercial deals that will help movethe project forward, also plans to refresh the pricing in its agreementwith contractor Bechtel, though Tellurian does not expect costs tosignificantly change.
机译:Tellurian很快就会与港口权威签署长期租赁 它建议的Driftwood LNG设施将在路易斯安那州建造,所以它可以 开始准备大型建筑,执行主席 Charif Souki 6月22日说。 开发商,后两项商业交易将有助于移动 该项目前进,也计划在其协议中刷新定价 与承包商Bechtel,虽然Tellurian并未期望成本 显着改变。

著录项

  • 来源
    《Inside FERC》 |2021年第28期|14-15|共2页
  • 作者

    Harry Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号