首页> 外文期刊>IEEE Computer Applications in Power >Sampling ACE data for NERC CPC surveys
【24h】

Sampling ACE data for NERC CPC surveys

机译:NERC CPC调查的ACE数据采样

获取原文
获取原文并翻译 | 示例
           

摘要

The North American Electric Reliability Council (NERC) requests that utilities collect area control error (ACE) information and report each month their performance in meeting the control performance criteria (CPC) set by NERC. NERC has also requested that utilities store data on diskettes for analysis and development of new criteria to reflect more accurately the performance of the control area. The integration of the equipment used to collect and store the required data and the software necessary for automation of the data gathering and analysis are discussed.
机译:北美电力可靠性委员会(NERC)要求公用事业公司收集区域控制错误(ACE)信息,并每月报告其在满足NERC设定的控制性能标准(CPC)方面的性能。 NERC还要求公用事业将数据存储在软盘上,以分析和制定新标准,以更准确地反映控制区的性能。讨论了用于收集和存储所需数据的设备以及用于自动化数据收集和分析的软件的集成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号