During reassembly of an upgraded turbine in the 41.7-MW Powerhouse 2 at Puget Sound Energy's 69.7-MW Sno-qualmie Falls project, the crane cable detached from the winch drum. The cable and a 150-pound draft tube liner segment dropped onto the work platform, where four PSE employees were working. Fortunately, the crew suffered only minor cuts and bruises during this incident, which occurred in July 2004.rnPSE reviewed the incident and determined that the cause was a combination of improper fittings on the cable ends and the crane hook being extended beyond its lower limit.
机译:在Puget Sound Energy的69.7 MW Sno-qualmie Falls项目中,在41.7 MW Powerhouse 2的升级涡轮机的重新组装过程中,起重机电缆从绞车卷筒上脱离了。电缆和一个150磅重的引流管衬管段掉落到工作平台上,该平台有4位PSE员工在工作。幸运的是,在2004年7月发生的这一事件中,机组仅遭受了轻微的伤痕。rnPSE对该事件进行了审查,并确定原因是电缆端部的配件不合适以及起重机吊钩超出其下限。

著录项

  • 来源
    《Hydro review》 |2009年第2期|7274-75|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号