...
首页> 外文期刊>European Transport Law >HIGH COURT OF ENGLAND AND WALES, QUEEN'S BENCH DIVISION, (COMMERCIAL COURT), 23 October 2018, [2018] EWHC 2756 (Comm)
【24h】

HIGH COURT OF ENGLAND AND WALES, QUEEN'S BENCH DIVISION, (COMMERCIAL COURT), 23 October 2018, [2018] EWHC 2756 (Comm)

机译:英格兰和威尔士高等法院,女王(商业法院),2018年10月23日,[2018] EWHC 2756(Comm)

获取原文
获取原文并翻译 | 示例
           

摘要

In the circumstances of the case the carrier is relieved from liability for half of the amount of the damage under Article 17, paragraph 4(c) CMR, since any damage resulting from poor circulation of the cooling air, other than in respect of the arrangement of pallets at the rear of the trailer, would properly be considered as the result of the stowage, which ex hypothesi compromised the flow of air to the rear of the trailer.
机译:在案件的情况下,载体从责任释放了第17条第4(C)CMR第17条第4(C)CMR的一半的一半,因为冷却空气循环不良导致的任何损坏,除了安排在拖车后部的托盘上,将被认为是由于载物的结果,这是前令人震惊地损害了拖车后部的空气流。

著录项

  • 来源
    《European Transport Law》 |2019年第2期|187-217|共31页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号