首页> 外文期刊>The engineering economist >MID-CYCLE CAPITAL PLANNING OPTIMIZATION
【24h】

MID-CYCLE CAPITAL PLANNING OPTIMIZATION

机译:中周期资本计划优化

获取原文
获取原文并翻译 | 示例
           

摘要

A typical capital rationing problem takes place at the beginning of a fiscal cycle, where a project portfolio is chosen to maximize expected return subject to a budget constraint. This article examines mid-cycle capital planning, which occurs near the end of a fiscal cycle. Motivated by the "budget-lapsing" rule, the decision-maker embarks on a "year-end spending spree." We use chance-constrained methodology to address two new constraints: reaching profit target set at the beginning of the year and exhausting the budget completely. Data from Lockheed Martin Space Systems illustrate how the optimal portfolio selection is influenced by these constraints.
机译:一个典型的资本配给问题发生在一个财政周期的开始,在一个预算周期内,选择一个项目组合以使期望收益最大化。本文研究了周期中的资本计划,该计划在财政周期即将结束时进行。在“预算超支”规则的激励下,决策者着手进行“年底支出狂潮”。我们使用机会受限的方法来解决两个新的限制:达到年初设定的利润目标和完全用尽预算。洛克希德·马丁太空系统公司的数据说明了最佳投资组合选择如何受到这些约束的影响。

著录项

  • 来源
    《The engineering economist》 |2009年第3期|250-265|共16页
  • 作者

    Cigdem Z. Gurgur;

  • 作者单位

    Richard T. Doermer School of Business and Management Sciences, Department of Management & Marketing, Indiana-Purdue University-Ft. Wayne, 2101 E. Coliseum Blvd., Ft. Wayne, IN 46805;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号