IN SEARCH OF INFRASTRUCTURE OPTIMIZATION: A FORMALIZED, DATA-CENTRIC APPROACH TO LONG-TERM CAPITAL PLANNING AND ASSET MANAGEMENT

机译:基础设施优化搜索:长期资本计划和资产管理的正式,以数据为中心的方法

获取原文

摘要

The City of Norfolk. Virginia's Department of Utilities, similar to other public utilities across the country, was facing capital rehabilitation and renewal demands that were soon going to be outpacing corresponding revenue growth. The City recognized the need to proactively reduce overall utility risk and to more accurately plan for long-term capital needs. In order to accomplish these objectives, the City leveraged its largest and most complex facility, the Moores Bridges Water Treatment Plant (MB WTP), as a means of j umpstarting its efforts to establish a more formal, data-centric asset management approach to capital improvement project identification and prioritization. The MB WTP is a conventional water treatment plant located near the Lake Wright area of Norfolk. With a plant capacity of 108 million gallons per day, it provides treated drinking water to the cities of Norfolk and Virginia Beach, part of the Norfolk Naval Station, and a portion of Chesapeake. The first construction on the Plant site occurred in 1873 with subsequent renovations in the 1950s and 1990s. Due to the age, size, and magnitude of capital needs at the MB WTP, the City decided to initiate a detailed asset evaluation of the facility, to not only plan for and mitigate pending infrastructure risk to the City, but also to leverage as a pilot and overall guide to conducting similar evaluations of the City's entire water and wastewater infrastructure assets. The primary goals of the Moores Bridges Asset Evaluation were to identify detailed 30-year capital improvement program elements related to the Plant, along with a current financial valuation of the facility. This presentation will discuss the series of tasks that the City completed that were designed to more accurately estimate the effective useful life of Plant assets based on available asset information and condition inspection: 1 Asset Inventory Analysis - the City conducted a desktop asset inventory analysis, reviewed historical operating reports, and conducted site visits to verify/develop the inventory of Plant assets necessary to appropriately assess risk, determine asset valuation and associated replacement costs, and identify long-term capital needs. 2 Risk Assessment - leveraging mobile data collection software and tools, the City evaluated physical and performance conditions of Plant assets to identify any known process, hydraulic, or condition issues that impact cost, efficiency, or operations and identified overall consequence of failure for Plant assets. 3 Asset Valuation - the City reviewed asset initial cost information, verified useful life and remaining useful life of Plant assets based on the risk assessment results, detennined overall replacement costs of Plant assets, and developed a high-level cost estimate for the construction of a new, comparable water treatment facility of similar capacity to the Moores Bridges Plant. 4 Capital Improvement Program Development - the City conducted a risk analysis of Plant assets and prioritized necessary annual renewal and replacement projects using a detailed financial forecasting tool. 5 Risk Assessment Training and Documentation - in order to sustain the program into the future, the City ensured that its Operations and Maintenance (O&M) staff were equipped to identify the current state of repair and operation of the Plant assets as influenced by age, historical maintenance, and service/operating conditions by providing classroom and field training covering the risk assessment methodology, forms, tools, and documentation of the assessment methodologies as Standard Operating Procedures (SOPs). 6 CMMS Data Enhancement - the City integrated all risk assessment data developed as part of the Moores Bridges Asset Evaluation into its computerized maintenance management system (CMMS) and provided data update training to its O&M staff. 7 Financial Model Training - the City provided hands-on financial forecasting model training to the staff responsible for the development and prioritization of the City's capital improvement program. The Moores Bridges Asset Evaluation conducted by the City of Norfolk allowed it to: (1) more accurately plan for long-term capital needs at the Plant; (2) proactively address water infrastructure risk to the City at its largest facility; and (3) lay the groundwork for a more formalized, data-centric, asset management approach across Public Utilities. The Moores Bridges Asset Evaluation helped the City to establish a more focused effort at taking the next large infrastructure planning and improvement step to ensure that a proactive asset management culture and strategy are in place to foster capital optimization and financial and infrastructure sustainability well into the future.
机译:诺福克市。弗吉尼亚州的公用事业部,类似于全国各地的其他公用事业,正在面临资本康复和更新要求,这很快将超越相应的收入增长。该市认识到需要积极降低整体公用事业风险,并更准确地规划长期资本需求。为了实现这些目标,该市利用其最大和最复杂的设施,船身桥接水处理厂(MB WTP),作为JUPSTARTINT努力建立更正式,数据以资本的资产管理方法的手段。改进项目识别与优先级。 MB WTP是一个常规的水处理设备,位于诺福克湖赖特地区附近。每天植物能力为1.08亿加仑,为诺福克和弗吉尼亚海滩的城市提供处理过的饮用水,部分诺福克海军站和切萨皮克的一部分。植物部位的第一次施工于1873年发生于20世纪50年代和1990年代的后续装修。由于MB WTP的资本需求的年龄,规模和程度,这座城市决定发起对该设施的详细资产评估,不仅要计划和减轻待申请的基础设施风险,还可以杠杆作为一个飞行员和整体指南进行城市整个水和废水基础设施资产的类似评价。 Moores Bridges资产评估的主要目标是确定与该工厂相关的30年资本改善计划要素,以及当前的设施财务估值。本演示文稿将讨论该城市已完成的一系列任务,这些任务是根据可用资产信息和条件检查更准确地估算植物资产的有效使用寿命:1资产库存分析 - 该市进行了桌面资产库存分析,审核历史营业报告,并进行了现场访问,以验证/制定适当评估风险所需的植物资产库存,确定资产估值和相关的更换成本,并确定长期资本需求。 2风险评估 - 利用移动数据收集软件和工具,该市评估了植物资产的物理和性能条件,以确定影响成本,效率或操作的任何已知的过程,液压或条件问题,并确定了植物资产失败的整体后果。 3资产估值 - 该市审查了资产初始成本信息,验证了有用的生命和植物资产的剩余使用寿命,基于风险评估结果,为植物资产的整体更换成本确定了一个高水平的成本估算新的,可比较的水处理设施对船身桥厂的类似能力。 4资本改善计划开发 - 该市对植物资产进行了风险分析,并使用详细的财务预测工具进行了植物资产的风险分析,并确定了必要的年度续订和更换项目。 5风险评估培训和文件 - 为了使该计划成为未来的计划,该城市确保其运营和维护(O&M)工作人员旨在确定当前植物资产的经济修复和运作状态,历史通过提供课堂和现场培训,涵盖评估方法的风险评估方法,表格,工具和文档作为标准操作程序(SOP)来维护和服务/操作条件。 6 CMMS数据增强 - 城市集成了作为Moores桥梁资产评估的一部分开发的所有风险评估数据进入其计算机化维护管理系统(CMMS),并为其O&M员工提供了数据更新培训。 7金融模式培训 - 该市提供了对负责该市资本改善计划的开发和优先级的工作人员的工作人员的实践金融预测模型培训。诺福克市进行的系泊桥资产评估允许它:(1)更准确地计划工厂的长期资本需求; (2)主动地在最大的设施达到城市的水资源基础设施风险; (3)为公共公用事业提供更加正式的,以数据为中心的资产管理方法奠定基础。 Moores Bridges资产评估有助于该市在采取下一个大型基础设施规划和改进步骤,以确保在未来促进资本优化和金融和基础设施可持续性的积极资产管理文化和战略,以确保更加集中的努力。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号