首页> 外文期刊>Journal of Modern Transportation >New technologies for high-risk tunnel construction in Guiyang-Guangzhou high-speed railway
【24h】

New technologies for high-risk tunnel construction in Guiyang-Guangzhou high-speed railway

机译:贵广高速铁路高风险隧道建设新技术

获取原文
           

摘要

Abstract Based on the construction of high risk tunnels in Guiguang-Guangzhou high-speed railway, several new technologies were developed for high-risk tunnel construction. First, an integrated advanced geological prediction was developed for tunneling in karst area. Then, a new system of ventilation by involving the dedusting technology was proposed and used in the field, which received a good air quality. Finally, a method to minimize the distance between the working face and the invert installation was proposed by optimizing the invert installation and adopting the micro bench method. Applying the method to the project obtained an excellent result. The achievement obtained for this study would be able to provide a valuable reference to similar projects in the future.
机译:摘要在桂广高铁高风险隧道建设的基础上,开发了高风险隧道建设的几种新技术。首先,开发了一种综合的先进地质预测方法,用于岩溶地区的隧道施工。然后,提出了一种采用除尘技术的新型通风系统,并在现场使用,获得了良好的空气质量。最后,通过优化倒置装置并采用微型工作台方法,提出了一种使工作面与倒置装置之间的距离最小的方法。将这种方法应用到项目中获得了极好的效果。这项研究获得的成就将能够为将来的类似项目提供有价值的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号