首页> 外文期刊>Management and Production Engineering Review >Prioritizing Interdependent Production Processes using Leontief Input-Output Model
【24h】

Prioritizing Interdependent Production Processes using Leontief Input-Output Model

机译:使用Leontief投入产出模型确定相互依存的生产流程的优先级

获取原文
           

摘要

This paper proposes a methodology in identifying key production processes in an interdependent production system. Previous approaches on this domain have drawbacks that may potentially affect the reliability of decision-making. The proposed approach adopts the Leontief input-output model (L-IOM) which was proven successful in analyzing interdependent economic systems. The motivation behind such adoption lies in the strength of L-IOM in providing a rigorous quantitative framework in identifying key components of interdependent systems. In this proposed approach, the consumption and production flows of each process are represented respectively by the material inventory produced by the prior process and the material inventory produced by the current process, both in monetary values. A case study in a furniture production system located in central Philippines was carried out to elucidate the proposed approach. Results of the case were reported in this work.
机译:本文提出了一种在相互依赖的生产系统中识别关键生产过程的方法。该领域的先前方法具有可能潜在地影响决策可靠性的缺点。所提出的方法采用了Leontief投入产出模型(L-IOM),该模型在分析相互依存的经济系统方面被证明是成功的。采用这种方法的动机在于L-IOM的实力,它提供了严格的定量框架来识别相互依赖的系统的关键组件。在此提议的方法中,每个过程的消耗和生产流程分别由先前过程产生的物料清单和当前过程产生的物料清单表示,均以货币值表示。在菲律宾中部的家具生产系统中进行了案例研究,以阐明建议的方法。在这项工作中报告了案件的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号