Application of gray fuzzy theory in the risk identification and control of venture project

机译:灰色模糊理论在风险项目风险识别与控制中的应用

获取原文
           

摘要

With the continuous improvement and development of current socio-economic, China's economic investment amounts in venture project that has core position in today's economic market presents an increasing trend. In addition, domestic venture project has made rather obvious progress on the number and specific size. It is a rather complex form in specific socio-economic structure and its production mode, whose key lies in the quality and safety index, project schedule, economic investment of the project, project cost and other comprehensive aspects. There are some problems in the implementation process of venture projects as well as the doubt and uncertainty in the relevant links. The presence of these characteristics impairs the venture project in the implementation process to some extent, and as a result, the risk evaluation and management of venture projects are indispensable. This paper conducts further analysis research on risk management method of venture project and comprehensive analysis research on its own characteristics, establishes risk evaluation model of gray fuzzy theory with the combination of the doubt and uncertainty in the venture project, and does comprehensive evaluation on the risk existing in the venture project. The crux of this study is to undertake a comprehensive risk evaluation and further clarify the specific evaluation process of the venture project by using the gray fuzzy theory.
机译:随着当前社会经济的不断发展和完善,在当今经济市场中处于核心地位的风险投资项目中的经济投资金额呈现出上升的趋势。此外,国内创业项目在数量和规模上都取得了明显的进步。它是特定社会经济结构及其生产方式中的一种相当复杂的形式,其关键在于质量和安全指数,项目进度,项目的经济投资,项目成本和其他综合方面。风险项目的实施过程中存在一些问题,以及相关环节的不确定性。这些特征的存在在一定程度上损害了风险项目的实施过程,因此,风险项目的风险评估和管理是必不可少的。本文对风险项目的风险管理方法进行了进一步的分析研究,并对风险项目自身的特点进行了综合分析研究,建立了不确定与不确定相结合的灰色模糊理论风险评价模型,对风险进行了综合评价。存在于风险项目中。这项研究的重点是运用灰色模糊理论进行全面的风险评估,并进一步阐明风险项目的具体评估过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号