...
首页> 外文期刊>Construction Management and Economics >Six-sigma as a strategy for process improvement on construction projects: a case study
【24h】

Six-sigma as a strategy for process improvement on construction projects: a case study

机译:六西格玛作为建设项目流程改进的策略:一个案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Significant expenditures of time, money and resources, both human and material, are wasted each year as a result of inefficient or non-existent quality management procedures. In an attempt to improve their market competitiveness, by limiting the extent of non-value-adding activities, some organizations are beginning to monitor the performance of internal and external engineering and construction processes. To achieve these bold aims, these organizations are looking to other industries such as manufacturing to examine the effectiveness of measuring and monitoring tools such as six-sigma. Only in recent years has the six-sigma method been utilized by some of the major players in the construction sector. To familiarize both researchers and practitioners on how to implement the six-sigma method and its potential benefits, the paper describes the outcomes of a six-sigma process improvement project (PIP) conducted for the construction of concrete longitudinal beams on the St Pancras raised railway station in London, UK. The outcome of the six-sigma PIP was the improved productivity of beam construction, enhanced interaction between project teams and reduced project delays. Moreover, interviews with key project participants were conducted to determine the success factors, barriers, suitability and advantages of the six-sigma approach compared with other TQM techniqes. In summary, the six-sigma approach provided the PIP team with a structured process improvement strategy to reduce waste and other non-value adding activities from the construction process.
机译:由于缺乏有效的质量管理程序或不存在质量管理程序,每年都在浪费大量的时间,金钱和资源,包括人力和物力。为了通过限制非增值活动的范围来提高其市场竞争力,一些组织开始监视内部和外部工程与施工过程的绩效。为了实现这些大胆的目标,这些组织正在寻找其他行业(例如制造业)来检验测量和监视工具(例如6-sigma)的有效性。直到最近几年,建筑行业的一些主要参与者才采用了六西格玛方法。为了使研究人员和从业人员熟悉如何实施六西格玛方法及其潜在收益,本文介绍了为在圣潘克拉斯高架铁路上建造混凝土纵梁而进行的六西格玛工艺改进项目(PIP)的成果。英国伦敦的火车站。六个西格玛PIP的结果是提高了梁施工的生产率,增强了项目团队之间的互动,并减少了项目延误。此外,还与关键项目参与者进行了访谈,以确定与其他TQM技术相比,六西格玛方法的成功因素,障碍,适用性和优势。总之,六西格玛方法为PIP团队提供了结构化的流程改进策略,以减少施工过程中的浪费和其他非增值活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号