首页> 外文期刊>Construction equipment >Scheduling BACT Retrofits
【24h】

Scheduling BACT Retrofits

机译:安排BACT改造

获取原文
获取原文并翻译 | 示例
           

摘要

The BACT Schedule compliance option lists the compliance date, engine model years affected, and required actions. Fleets that comply with this schedule do not have any reporting requirements. In any given year, engines about seven years old or newer will always meet the requirements of this schedule. A fleet can meet the replacement requirement by replacing a vehicle with one that has a 2010-model-year engine or with one that has a later compliance date on the schedule. For example, a fleet owner with a 1994 engine could meet the Jan.1, 2013, compliance requirements by replacing the existing truck with one that has a 2007-model-year engine originally equipped with a PM filter.
机译:BACT计划合规性选项列出了合规日期,受影响的发动机型号年份以及必需的措施。符合此时间表的机队没有任何报告要求。在任何给定年份,大约七岁或更晚的发动机将始终满足此计划的要求。车队可以通过用具有2010型号年发动机的车辆或按时间表推迟合规日期的车辆替换车辆来满足更换要求。例如,拥有1994年发动机的车队所有者可以通过使用原来装有PM过滤器的2007年型号发动机的卡车代替现有卡车来满足2013年1月1日的合规性要求。

著录项

  • 来源
    《Construction equipment》 |2009年第11期|27|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号