Safety Interval Analysis: A Risk-based Approach To Specify Low-risk Quantities Of Uncertainties For Contractor's Bid Proposals

机译:安全间隔分析:一种基于风险的方法,为承包商的投标建议指定不确定性的低风险数量

获取原文
获取原文并翻译 | 示例
           

摘要

By appearing more complex projects, Design-Bid-Build (DBB) contracts could not satisfy new projects requirements and a need to new types of contracts was felt. New contracts requirements differ from previous ones. Challenging the method of proposal offering in design-construct contracts, this paper seeks solutions for more rational proposing of project uncertainties. The problem commences with the question "which duration and price a contractor must propose in a project with design-construct contract?" A part of the answer to this question is the matter of the lowest-risk limit of uncertainties which result from output of Monte Carlo Simulation and its analysis. The output of this analysis is a series of intervals named "safety Intervals" which will be contractors' guide in offering the bid proposal.
机译:通过出现更复杂的项目,设计投标建造(DBB)合同无法满足新项目的要求,因此人们认为需要新的合同类型。新合同要求与以前的要求不同。挑战设计—施工合同中的建议书提供方法,为更合理地提出项目不确定性寻求解决方案。问题始于“承包商在设计建造合同项目中必须建议的期限和价格?”这一问题开始。该问题的部分答案是由蒙特卡洛模拟及其分析产生的不确定性的最低风险极限问题。此分析的输出是一系列名为“安全间隔”的间隔,这些间隔将作为承包商提供投标建议的指南。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号