Variations may give rise to additions or deductions from the contract sum and may also require an adjustment to the completion date, depending on the nature and scale of the variation. The key starting point when valuing a variation is the terms of the relevant construction contract. Generally speaking, there are two approaches to the valuation of variations: 1. Using contractual rates 2. Valuing on a cost basis. Different standard forms take different approaches. For example, the JCT forms generally seek to value variations using the contractual rates, whereas the NEC forms generally seek to value variations on a cost basis.
机译:变化可能导致从合同总和增加或扣除,并且还可能需要调整完成日期,这取决于变异的性质和规模。重视变异时的关键起点是相关施工合同的条款。一般来说,有两种估值的倾向的变化:1。使用合同率2.以成本为基础估值。不同的标准形式采取不同的方法。例如,JCT形式通常寻求使用合同率的价值变化,而NEC表格通常会以成本为基础寻求价值变化。

著录项

  • 来源
    《Building》 |2020年第14期|48-49|共2页
  • 作者

    Sara Cunningham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号