...
首页> 外文期刊>Building design >EH forces rethink of British Museum plans
【24h】

EH forces rethink of British Museum plans

机译:EH部队重新考虑大英博物馆计划

获取原文
获取原文并翻译 | 示例
           

摘要

Rogers Stirk Harbour & Partners' plan for a major new exhibition space at the British Museum has been delayed following a row with English Heritage.rnSenior partner at the practice Graham Stirk, was due to give details of the 10,000sq m extension at a lecture last week, but unsuccessfully tried to cancel the event after EH raised objections to the proposals.rnPhilip Davies, planning development director at English Heritage, told BD the museum had "raced ahead" with the scheme - which also includes office and conservation space -without justifying the demolition of a grade I listed book bindery and two replica Georgian buildings on the overall grade I listed site.rn"To secure consent to demolish the bindery it needs to set out the criteria for the demolition of the buildings in [planning policy] PPG 15, and put forward arguments as to why that needs to happen - it didn't bother," he said.
机译:罗杰斯·斯特克(Rogers Stirk Harbour&Partners)与英国文化遗产争吵之后,大英博物馆的一个大型新展览空间的计划被推迟了。一周,但在EH对该提案提出异议后,试图取消该活动未能成功。rn英国遗产规划开发总监Philip Davies告诉BD,该博物馆“无可厚非”了该计划-其中还包括办公室和保护区-没有道理一级拆下的第一册书架和两座乔治亚风格的仿制建筑物在整个一级清单上的拆除。rn“要确保同意拆除该册子,需要在[规划政策] PPG中规定建筑物的拆迁标准15日,并提出了关于为什么需要发生这种情况的争论-它没有打扰,”他说。

著录项

  • 来源
    《Building design》 |2008年第1827期|3|共1页
  • 作者

    Will Henley;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号