LOOKING AFTER OLDER BRIDGES

机译:在旧桥后寻找

获取原文
获取原文并翻译 | 示例
           

摘要

Many of today's challenging issues for bridge engineers come from looking after old structures. In the years to come, Cowi's Tina Vejrum expects to see more projects to replace decks on existing suspension bridges, following Canada's original lead with the Lions' Gate Bridge and now the ongoing Macdonald Bridge project. "I think there is a new market there with interesting challenges," she says. A number of such bridges are reaching the end of their service life, she says. "Fortunately on a suspension bridge we can replace the deck - it's a lot easier than for a cable-stayed bridge." Limiting closure times is a key issue, as too is maintaining the aerodynamic stability in the interim phase where the bridge is not fully connected and has two different cross sections.
机译:对于桥梁工程师而言,当今许多具有挑战性的问题都来自于维护旧结构。在加拿大的最初领导者狮门大桥和现在正在进行的麦克唐纳德大桥项目之后,Cowi的Tina Vejrum希望在未来的几年中看到更多的项目来替换现有吊桥上的甲板。她说:“我认为那里有一个充满挑战的新市场。”她说,许多这样的桥梁已经达到使用寿命。 “幸运的是,我们可以在吊桥上更换甲板,这比斜拉桥要容易得多。”限制关闭时间是一个关键问题,在过渡阶段(桥梁未完全连接且具有两个不同的横截面)的过渡阶段,也要保持空气动力学稳定性。

著录项

  • 来源
    《Bridge design & engineering》 |2016年第83suppla期|16-16|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号