首页> 外文期刊>The Baltic journal of road and bridge engineering >LIFE-CYCLE COST OF BRIDGES - FIRST STEPS TO A HOLISTIC APPROACH
【24h】

LIFE-CYCLE COST OF BRIDGES - FIRST STEPS TO A HOLISTIC APPROACH

机译:桥梁的生命周期成本-整体方法的第一步

获取原文
获取原文并翻译 | 示例
           

摘要

Bridges create transport infrastructure and are subjected to long term witness of economic design, reliability, durability, maintainability and external risk (natural and human hazards). Deficient design of bridges points to high investment costs, low quality, retrofits maintenance costs, mitigates quality damages. The primary reason of the problem is usually stated high investment costs. Resources for investment are limited over and over again. However, approach for evaluating and comparing the cost effectiveness in practical design does not dominate in present-days as arbitration of different strategies and warrant for avoiding critical economic or functional situations. This paper illustrates a method for estimating the retrofits for bridges design based on Life-Cycle Costs and Cost-Benefit Analysis. The approach integrates cost model, fragility of as-designed and retrofitted benefits for a range of externalities and associated potential changes in design and economical retrofit. The emphasis on life-time performance and benefits, as opposed to initial retrofit acquisition investment cost alone, paves the way to risk-wise investment and also helps to support upgrade actions for sustainable infrastructure. An application of the holistic approach Life-Cycle Cost and benefit analysis is conducted for two representative bridges of highway class. The available financing has a big influence on the chosen technical design.
机译:桥梁构成了运输基础设施,并长期受到经济设计,可靠性,耐久性,可维护性和外部风险(自然和人为危险)的见证。桥梁设计不足会导致高投资成本,低质量,翻新维护成本,减轻质量损失。问题的主要原因通常是高投资成本。投资资源一再受到限制。但是,当今评估和比较实际设计中的成本效益的方法并不占主导地位,因为仲裁采用了不同的策略,可以避免出现严重的经济或职能情况。本文阐述了一种基于生命周期成本和成本效益分析的桥梁设计改造估算方法。该方法集成了成本模型,设计和翻新收益的脆弱性,以及一系列外部性以及设计和经济翻新的相关潜在变化。与仅用于初始改造的购置投资成本相比,对终生性能和收益的重视为风险投资进行了铺垫,还有助于支持可持续基础设施的升级行动。整体方法生命周期成本和收益分析的应用是针对两座具有代表性的公路桥梁进行的。可用资金对所选技术设计有很大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号