首页> 外文期刊>Automation in construction >Determination of the cutterhead torque for EPB shield tunneling machine
【24h】

Determination of the cutterhead torque for EPB shield tunneling machine

机译:EPB盾构掘进机刀盘扭矩的确定

获取原文
获取原文并翻译 | 示例
       

摘要

Cutterhead torque is an important parameter for the design and operation of earth pressure balance (EPB) shields. Based on the analysis of several completed project cases from job sites, the conventional torque determination model based on experimentation proves rough enough to be improved. Composition and corresponding calculation method of cutterhead torque are presented, taking into account of cutterhead structure, cutting principle and the interaction between cutterhead and soil. Considering a Φ1.8 m EPB test machine in the lab, theoretical calculation following the improved model and test are carried out with three typical types of soils. Calculation and test results indicate that the cutterhead torque varies with geological conditions apparently, and the opening ratio of the cutterhead as well as earth pressure turns out to be the two most important factors in determining the cutterhead torque. The test results also show that the torque calculation formula for EPB shield tunneling can reasonably predict the excavation torque required by the cutterhead in clay soil tunneling, but for cohesionless tunneling, soil conditioning reduces the amount of torque necessary.
机译:刀盘扭矩是接地压力平衡(EPB)护罩的设计和操作的重要参数。在对几个工作现场已完成的项目案例进行分析的基础上,基于实验的常规扭矩确定模型证明足够粗略,可以加以改进。结合刀盘的结构,切割原理以及刀盘与土壤的相互作用,提出了刀盘扭矩的组成及相应的计算方法。考虑到实验室中的Φ1.8m EPB试验机,根据改进的模型和试验对三种典型类型的土壤进行了理论计算。计算和测试结果表明,刀盘扭矩明显随地质条件而变化,而刀盘的开口率以及土压力是决定刀盘扭矩的两个最重要的因素。试验结果还表明,EPB盾构掘进的扭矩计算公式可以合理地预测粘土土掘进机刀盘所需的开挖扭矩,但对于无粘性的掘进,土壤调理减少了所需的扭矩量。

著录项

  • 来源
    《Automation in construction》 |2011年第8期|p.1087-1095|共9页
  • 作者单位

    State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China;

    State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China;

    State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China;

    State Key Laboratory of Fluid Power Transmission and Control, Zhejiang University, Hangzhou 310027, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    EPB tunneling; cutterhead torque; calculation; opening ratio; earth pressure;

    机译:EPB隧道;刀盘扭矩;计算开口率土压力;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号