System information modelling in practice: Analysis of tender documentation quality in a mining mega-project

机译:实践中的系统信息建模:大型采矿项目中招标文件质量的分析

获取原文
获取原文并翻译 | 示例
           

摘要

The quality of information contained in tender documentation produced using Computer-Aided-Design (CAD) and provided in a hard-copy format to an electrical engineering contractor for a port expansion facility, which formed an integral part of an Iron Ore mega-project is analyzed. A System Information Model (SIM), which is an object oriented approach, was retrospectively constructed from the documentation provided to assist the contractor with their tender bid preparation. During the creation of the SIM, a total of 426 errors and omissions were found to be contained within the 77 tender 'drawing' documents supplied to the contractor by an Engineering, Construction, Procurement and Management (EPCM). Surprisingly, 70 drawings referenced in the tender documentation, and the Input/Output lists and Cause/Effect drawings were not provided. Yet, the electrical contractor was required by the EPCM organization to provide a lump sum bid and also guarantee the proposed schedule would be met; the financial risks were too high and as a result the contractor decided not to submit a bid. It is suggested that if the original tender documentation had been prepared using a SIM rather than CAD, the quality of information presented to the contractor would have enabled them to submit a competitive bid for the works. The research concludes that the economic performance and productivity of mining projects can be significantly improved by using a SIM to engineer and document electrical instrumentation and control (EIC) systems.
机译:使用计算机辅助设计(CAD)生成的招标文件中包含的信息质量,以硬拷贝格式提供给港口扩展设施的电气工程承包商,该设施是铁矿石大型项目的组成部分,分析。从提供的文档中回顾性地构建了一种系统信息模型(SIM),它是一种面向对象的方法,可帮助承包商准备投标。在创建SIM的过程中,发现由工程,施工,采购和管理(EPCM)提供给承包商的77份“图纸”招标文件中总共包含426个错误和遗漏。令人惊讶的是,没有提供招标文件中引用的70张图纸,以及“输入/输出”列表和“因果”图纸。但是,EPCM组织要求电气承包商提供一次总价投标,并保证能够满足提议的时间表;财务风险过高,因此承包商决定不投标。建议如果原始招标文件是使用SIM而不是CAD来准备的,则提供给承包商的信息质量将使他们能够为工程进行竞争性投标。该研究得出的结论是,通过使用SIM设计和记录电气仪表和控制(EIC)系统,可以显着提高采矿项目的经济绩效和生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号