首页> 外文期刊>Annals of Operations Research >Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints
【24h】

Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints

机译:网格状网络和模糊操作时间约束下的多峰过程原型

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes a Grid-like Material Transportation Network (GMTN) in which several heterogeneous means of transportation (Automated Guided Vehicles (AGVs), hoists, lifts, etc.) interact with each other via common shared workstations to provide a variety of demand-responsive material handling operations. Different material handling transport modes provide movement of workpieces between workstations along their manufacturing routes in the GMTN and they can be seen as processes realized with synergic utilization of various local periodically acting unimodal processes. The main contribution of this research is the solution of a constraint satisfaction problem addressing AGVs fleet match-up scheduling subject to GMTN and fuzzy operation time constraints. In the presented case both production rate (production takt) and operations execution time are described by imprecise (fuzzy) data. In other words, the research's objective concerns assessing grid-like networks of periodically acting local transportation modes from the perspective of possible mass-customized oriented requirements imposed on scheduling of multimodal flows of jobs assigned to certain technological routes passing through common shared workstations.
机译:本文介绍了一种类似于网格的物料运输网络(GMTN),其中几种不同的运输方式(自动导引车(AGV),提升机,升降机等)通过公用的共享工作站相互交互,以提供多种需求-响应式物料搬运操作。不同的物料搬运运输方式使工件在GMTN中沿其制造路线在工作站之间移动,并且可以将它们视为通过协同利用各种局部周期性作用的单峰过程而实现的过程。这项研究的主要贡献是解决了满足GMTN和模糊操作时间约束的AGV车队匹配调度的约束满足问题。在这种情况下,生产率(生产节拍)和操作执行时间均由不精确(模糊)的数据描述。换句话说,研究的目标是从可能的大规模定制导向要求的角度评估周期性作用于本地运输模式的网格状网络,这些要求是对分配给通过共同共享工作站的某些技术路线的多模工作流的调度施加的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号