Public work contract laws on project delivery systems and their nexus with project efficiency: evidence from Ethiopia

机译:项目交付系统的公共工作合同法及其与项目效率的Nexus:来自埃塞俄比亚的证据

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Time, money, and quality are the three basic criteria for measuring construction project efficiency. The Ethiopian construction sector in general and public work projects, in particular, are believed to suffer from inefficiencies despite their quantitative growth in recent years. Previous researches have made attempts to explore factors determining the efficiency of the sector such as the low capacity of contractors (both financial and equipment, shortage of skilled human resource on technical, managerial, and entrepreneurial skills, etc…), the poor performances of the supply chain, inflation in the economy and so on. However, process and system-based challenges of the sector resulting from the existing legal frameworks governing the sector such as the modes of delivery of projects (modes of contracting) have not been a subject of extensive study. In this study, doctrinal and non-doctrinal legal research methods are employed to explore project delivery system(s) recognized in Ethiopia's public work contract laws and appraise their efficiency in terms of ensuring prompt completion of public construction projects. The doctrinal aspect of the research exposed that, despite an implied recognition of Design-Build (DB) and its variant forms of project delivery system, the country's public work contract laws set up Design-Bid-Build (DBB) as a default mode of contracting. Besides, the result from a survey questionnaire of 158 respondents which was computed by using Research Package for Social Sciences (SPSS) to generate the Relative Importance Index (RII) of each mode of contracting corroborated by primary data derived from the completion and status report of 40 road and 9 building projects, shows that even though construction project time overrun (delay) often happens in both routes of contracting, the magnitude of such inefficiency is greater in public projects of DBB than DB delivery mode.
机译:时间,金钱和质量是测量建筑项目效率的三个基本标准。特别是埃塞俄比亚建筑业,特别是近年来仍遭受效率低下的效率低下。以前的研究已经尝试探讨确定诸如承包商低容量(金融和设备,技术,管理和创业技能的缺乏资源缺乏的部门效率的因素,这是糟糕的表现供应链,经济通货膨胀等。然而,由现行法律框架的工艺和基于系统的挑战,该部门由管理部门的现有法律框架(如项目方式)(合同模式)尚未成为广泛研究的主题。在这项研究中,教义和非教义法律研究方法旨在探讨在埃塞俄比亚公共工作合同法中公认的项目交付系统,并在确保迅速完成公共建设项目方面评价其效率。该研究的教义方面暴露了,尽管暗示了设计 - 构建(DB)及其变种形式的项目交付系统,但该国的公共工作合同法将设计 - 投标(DBB)设置为默认模式承包。此外,由158名受访者的调查问卷由使用研究包来源为社会科学(SPSS)来生成通过从完成和状态报告的主要数据生成的每种缔约模式的相对重要性指数(RII)来计算的40道路和9个建筑项目表明,尽管建设项目时间超支(延迟)经常发生在契约的两种航线中,但在DB交付模式的公共项目中,这种低效率的大小更大。