In line with the difficult technical problems related to the precise location of integrated pipelines at metro entrance,re-search on the process optimization of the entrance pipelines is carried out. By using BIM technology,visual simulation of the integrated pipelines at metro entrance is realized,and the opti-mized pipeline construction technology has be used in practical project(the Liangxi Station).The result shows that BIM technol-ogy could optimize the pipeline construction,enhance the con-struction quality ad shorten the construction period effectively.%针对综合管线在地铁出入口位置难以精确定位这一技术难题,开展了地铁出入口综合管线工艺优化方法的研究.利用BIM(建筑信息模型)技术对地铁出入口综合管线进行可视化仿真,得到优化后的地铁出入口综合管线施工工艺,并依此工艺在梁溪站进行施工.结果表明,采用BIM技术对地铁出入口综合管线施工工艺进行优化,可显著提高地铁出入口综合管线的施工质量,同时可有效缩短施工工期.
展开▼