To solve the problem that lifting platforms of passenger ropeway operate asynchronously and multi-mechanism complex system is not steady in operation, a multi-body dynamic model is established to find the reasons behind the problem. The model helps solve asynchronization in lifting and make the multi-mechanism system more stable, which is an effective solution to the problems in engineering practice.%针对客运索道升降平台起升不同步、多机构复杂系统的稳定性不足的现象,建立系统多体动力学模型,分析产生以上现象的原因,解决起升不同步的问题,并优化多机构运动系统的稳定性,解决工程实际问题.
展开▼