Rule-and PSO Algorithm-based Dynamic Spatial Rescheduling Method for Hull Curved Block Construction

         

摘要

Due to no effective rescheduling method in hull curved block construction planning, existing scheduling planning can't be applied in practical production effectively. Two-dimensional layout and dynamic attributes of block construction planning are considered to develop a spatial rescheduling method, which is based on the spatial points searching rule and the particle swarm optimization(PSO) algorithm. A dynamic spatial rescheduling method is proposed to solve the manufacturing problem of rush-order blocks. Through spatial rescheduling, the rescheduling start time, the current processing information set and rescheduling blocks set can be obtained automatically. By using and updating the data of these sets, the rescheduling method combines the PSO algorithm with the spatial points searching rule to determine the rescheduling start time and layout of the blocks. Three types of dynamic events, including rush-order block delay, existing block delay and existing block position changes, are used to address problems with different function goals by setting different function weights. Finally, simulations based on three types of rush-order block events are performed to validate this method, including single rush-order block, multi rush-order blocks at the same time and multi rush-order blocks at different times. The simulation results demonstrate that this method can solve the rush-order block problems in hull block construction and reduce the interference to the existing manufacturing schedule. The proposed research provides a new rescheduling method and helps instruct scheduler to make production planning in hull block construction.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号