首页> 外文会议>Underground space for sustainable urban development >Construction of Shaft Tunnel by Slurry Pipe Jacking through Sedimentary Ground under High Water Pressure
【24h】

Construction of Shaft Tunnel by Slurry Pipe Jacking through Sedimentary Ground under High Water Pressure

机译:高水压下泥水顶管泥沙穿越竖井的施工。

获取原文
获取原文并翻译 | 示例

摘要

A shaft tunnel driven by pipe jacking was adopted in order to provide ventilation to the undergroundrnreservoir tunnel under the national highway in Yokohama, Japan. Downward excavation of thern2000mm ID ventilation tunnel starts from ground surface and reaches to the crown of the existingrnreservoir tunnel, which is located 87.8m deep. Depression angle of the tunnel is set as 75.6 degree.rnPore water pressure at the arrival is 0.66MPa. This project is one of the largest in this type of tunnelsrnin Japan. As Oogihara et al. (2003) described on details of the shield machine, this paper focuses onrnequipment and facilities adopted in the project and construction methodology of the inclined pipernjacking.
机译:为了给日本横滨的国道下的地下储层隧道提供通风,采用了由顶管驱动的竖井隧道。 2000毫米ID通风隧道的向下开挖始于地面,并到达深87.8m的现有水库隧道的顶部。隧道的俯角设定为75.6度。到达时的孔水压力为0.66MPa。该项目是日本同类隧道中规模最大的项目之一。如Oogihara等。 (2003年)详细介绍了盾构机,本文重点介绍了倾斜顶管工程和施工方法中所采用的设备和设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号