【24h】

IT Project Management, Concept Modeling, and Blind Dates

机译:IT项目管理,概念建模和相亲日期

获取原文
获取原文并翻译 | 示例

摘要

This paper describes a recent activity where scholars from two disciplines met to consider the reasons behind a three-decade long attempt to modernize a critical IT application in the US government. From the system dynamics perspective, the problem appears to be related to dynamic and repeating management failures with an embedded project management model. We decided to use a simple project model to develop this perspective. Our initial attempt shows some of the anticipated dynamics of project escalation. More important, though, was the discussion of the problem itself that was launched by the use of a formal model. We believe that this approach has provided insight into how to approach a more focused and grounded analysis of the problem domain.
机译:本文描述了最近的一次活动,来自两个学科的学者开会,讨论了为期三年的美国政府现代化关键IT应用现代化的长期尝试背后的原因。从系统动力学的角度来看,问题似乎与具有嵌入式项目管理模型的动态和重复管理失败有关。我们决定使用一个简单的项目模型来发展这种观点。我们的初步尝试显示了项目升级的一些预期动态。但是,更重要的是通过使用正式模型对问题本身进行的讨论。我们认为,这种方法提供了有关如何对问题域进行更集中,更扎实的分析的见识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号