首页> 外文会议>Seventh large open pit mining conference 2010 >Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes
【24h】

Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes

机译:大型断层斜坡的三维水力模拟

获取原文
获取原文并翻译 | 示例

摘要

Owing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, including explicit representations of large numbers of discontinuities. The analysis requires fewer assumptions than uncoupled analysis or two-dimensional (2D) analysis, but may require a change in how hydrological data is collected. The way hydrological data is incorporated in stability assessment and the approach to uncertainty in hydrological information also requires discussion. The current procedures for this type of analysis are discussed, along with some practical difficulties and teachings from early applications. A work flow for integration of 3D hydromechanical modelling with pit planning and some considerations for the management of uncertain data are also proposed.
机译:由于计算机能力的提高,现在可以对矿井进行完全耦合或部分耦合的三维(3D)流体力学有限元(FE)模拟,包括大量不连续点的明确表示。与非耦合分析或二维(2D)分析相比,该分析所需的假设更少,但可能需要更改水文数据的收集方式。将水文数据纳入稳定性评估的方式以及解决水文信息不确定性的方法也需要讨论。讨论了用于这种类型分析的当前程序,以及一些实际困难和早期应用的教导。还提出了将3D流体力学建模与矿井计划相集成的工作流程,以及管理不确定数据的一些注意事项。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者

    D Beck; B Fillery; F Reusch;

  • 作者单位

    Mining Group, Beck Arndt Engineering Pty Ltd, 9 Reid Drive, Chatswood West NSW 2067;

    Applied Mechanic, Beck Arndt Engineering Pty Ltd, 33 Cedric Street, Stirling WA 6021;

    Applied Mechanics, Beck Arndt Engineering Pty Ltd, Roennebergstr 15, Berlin 12161, Germany;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号