【24h】

Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System

机译:公路铁路联运控制系统的效益成本评价

获取原文
获取原文并翻译 | 示例

摘要

An intermodal control system (ICS) has been designed for the Long Island Railroad (LIRR) to minimize conflicts between trains and intersecting at-grade highways. A field test was performed in June 2001, at New Hyde Park (NHP), NY, a suburban passenger station with a nearby highway crossing. Because deployment will not occur for several years, a benefit-cost evaluation of this system is prospective, based on data obtained before and during the tests, and from simulation results. The project is of particular interests because it includes both the control of trains for the benefit of highway users and the control of highway users for the benefit of railroad operations. So far, the quantitative analysis presented here relies on illustrative trial values that are intended to be within the range of plausibility, but will require considerable further refinement.
机译:已为长岛铁路(LIRR)设计了一种联运控制系统(ICS),以最大程度地减少火车与相交的公路之间的冲突。 2001年6月,在纽约州新海德公园(NHP)的一个郊区客运站进行了现场测试,附近有一个高速公路交叉口。由于几年内不会进行部署,因此基于测试之前和测试期间获得的数据以及模拟结果,对该系统的成本效益进行评估是有前途的。该项目特别受关注,因为它既包括为高速公路使用者带来利益的列车控制,也包括为铁路运营带来利益的高速公路使用者控制。到目前为止,此处介绍的定量分析依赖于说明性的试验值,这些试验值应在合理范围内,但仍需要进一步改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号