The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsview Station to Steeles Avenue. This Environmental Assessment Study was performed in three phases including routes and general station locations, alignments and station concepts and detailed assessment of the effects of the undertaking. URS Canada Inc. has led the consultant team for this Study. The anticipated total duration of the project is approximately 6 years and its estimated total cost is about $1.4 billion. This paper presents the planning process of the project, the environmental and engineering challenges, and the measures taken to address them.