首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >ENVIRONMENTAL ASSESSMENT STUDY FOR EXTENSION OF SPADINA SUBWAY IN TORONTO
【24h】

ENVIRONMENTAL ASSESSMENT STUDY FOR EXTENSION OF SPADINA SUBWAY IN TORONTO

机译:多伦多西班牙地铁延伸的环境评估研究

获取原文
获取原文并翻译 | 示例

摘要

The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsview Station to Steeles Avenue. This Environmental Assessment Study was performed in three phases including routes and general station locations, alignments and station concepts and detailed assessment of the effects of the undertaking. URS Canada Inc. has led the consultant team for this Study. The anticipated total duration of the project is approximately 6 years and its estimated total cost is about $1.4 billion. This paper presents the planning process of the project, the environmental and engineering challenges, and the measures taken to address them.
机译:多伦多市和多伦多运输委员会(TTC)已对Spadina地铁从Downsview站到Steeles Avenue的6.2公里,4站地下延伸进行了个人环境评估(EA)。这项环境评估研究分三个阶段进行,包括路线和一般车站的位置,路线和车站的概念以及对事业效果的详细评估。加拿大URS公司领导了这项研究的顾问团队。该项目的预计总工期约为6年,预计总成本约为14亿美元。本文介绍了项目的计划过程,环境和工程挑战以及为应对这些挑战而采取的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号