首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >CHALLENGES AND SOLUTIONS TO DESIGNING DEEP EXCAVATIONS FOR URBAN TRANSIT STATIONS
【24h】

CHALLENGES AND SOLUTIONS TO DESIGNING DEEP EXCAVATIONS FOR URBAN TRANSIT STATIONS

机译:城市公交车站深基坑设计的挑战和解决方案

获取原文
获取原文并翻译 | 示例

摘要

The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon Valley Rapid Transit Project, which extends the existing Bay Area Rapid Transit (BART) system southward from Fremont to San Jose. The Tunnel Segment includes twin bored tunnels, mined cross passages, and three deep station excavations situated in highly variable ground, high ground water table, and a dense urban setting with high-rise buildings adjacent to the largest excavation. This paper will discuss design challenges that have arisen with the excavations and the proposed solutions.
机译:Hatch Mott MacDonald / Bechtel合资企业团队是整个16英里硅谷快速交通项目的5.25英里隧道部分的设计师和施工经理,该项目将现有的湾区快速交通(BART)系统从弗里蒙特向南扩展到圣何塞隧道段包括双孔隧道,开采的过道和三个深部车站开挖,位于高度变化的地面,高地下水位和密集的城市环境中,高层建筑与最大的开挖相邻。本文将讨论挖掘和提出的解决方案带来的设计挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号